Top Cladding Companies in UAE — Verified ACP, GRC & Facade Suppliers

Home > UAE > Cladding in UAE - 69 Listings
  • P.O. Box:
    3195
  • Address :
    9FJR+68P Al Mulla Carpentry Rd - Ajman Industrial 1 - Ajman
  • Area :
    Ajman Free Zone
  • City :
    Ajman

  • P.O. Box:
    19154
  • Address :
    Al Ghusais Area
  • Area :
    Al Qusais
  • City :
    Dubai

  • P.O. Box:
    54261
  • Address :
    Dubai Airport Free Zone
  • Area :
    Dubai Airport Free Zone
  • City :
    Dubai

Results 1 - 20 out of 69

PROFILE OF Cladding

FAQS

How much does cladding installation cost in UAE?

Cladding installation costs in the UAE typically range between AED 150 and AED 450 per square metre depending on material type and building height.

  • ACP panels: AED 150–250 per sqm for standard fire-rated sheets.
  • GRC cladding: AED 200–350 per sqm depending on mould complexity.
  • Stone cladding: AED 300–450 per sqm for marble or granite finishes.
  • High-rise projects add scaffolding and access costs on top of material and labour.

Is combustible ACP cladding banned in UAE?

Yes, combustible polyethylene-core ACP cladding is effectively restricted on new facades in Dubai following Dubai Civil Defence's fire-safety directives introduced after the 2015-2016 tower fires.

  • New buildings must use A2-rated or FR (fire-retardant) mineral-core panels.
  • Existing towers with combustible cladding face mandatory retrofit programs.
  • Dubai Municipality reviews facade material certificates during permit approval.

What is the difference between ACP and GRC cladding?

ACP (Aluminium Composite Panel) is a lightweight metal-faced panel used for flat, modern facades, while GRC (Glass Reinforced Concrete) is a cement-based composite used for decorative, moulded, or curved architectural features.

  • ACP suits commercial towers and warehouses needing quick installation.
  • GRC suits mosques, heritage buildings, and ornamental facades.
  • GRC is heavier and requires structural support calculations.

Do cladding contractors need Dubai Municipality approval?

Yes, cladding contractors working on buildings in Dubai must submit facade material specifications for Dubai Municipality and Dubai Civil Defence approval before installation.

  • Approval confirms fire-rating compliance of ACP core materials.
  • Structural cladding fixings must meet UAE building code wind-load requirements.
  • Retrofit projects require a separate facade replacement permit.

How long does cladding retrofit take on a UAE tower?

A full facade cladding retrofit on a mid-rise UAE tower typically takes 3 to 9 months depending on building height and occupancy status.

  • High-rise towers above 40 floors can take 12 months or longer.
  • Occupied buildings require phased scaffolding to minimise disruption.
  • Timeline extends if the original combustible ACP requires full removal.

What certifications should a UAE cladding supplier have?

A reputable UAE cladding supplier should hold ESMA product conformity certification, fire-rating test reports for ACP panels, and a valid trade licence from Dubai Municipality or the relevant emirate.

  • Fire test reports should reference recognised international standards such as BS 8414 or EN 13501.
  • ESMA certification confirms imported panel conformity at customs.
  • Ask for references from completed high-rise or villa projects in the UAE.

Which UAE cities have the most cladding manufacturers?

Dubai has the largest concentration of cladding manufacturers and contractors in the UAE, particularly in Al Quoz Industrial Area and Dubai Investment Park, followed by Sharjah's industrial areas and Ajman Free Zone.

  • Al Quoz hosts multiple GRC and ACP fabrication workshops.
  • Sharjah's Industrial Area 12 is known for GRC and fibreglass factories.
  • Jebel Ali Free Zone hosts larger-scale panel manufacturers serving export markets.

Can cladding be used on villa exteriors in UAE?

Yes, stone, metal, and composite cladding are commonly used on UAE villa exteriors for both aesthetic finishing and heat insulation.

  • Natural stone cladding is popular for entrance facades and boundary walls.
  • Metal cladding sheets are used for modern minimalist villa designs.
  • Cladding also reduces external wall surface temperature in Gulf summers.

How do I choose between local UAE cladding manufacturers and imports?

Local UAE cladding manufacturers generally offer faster delivery and easier compliance with Dubai Civil Defence fire-rating rules, while imported panels may offer specific finishes not locally produced.

  • Local sourcing avoids customs delays and simplifies ESMA conformity checks.
  • Imported panels still require UAE fire-rating certification before installation.
  • Local suppliers can typically provide site visits and sample mock-ups faster.

What warranty is standard for cladding work in UAE?

Most UAE cladding contractors offer a standard workmanship warranty of 1 to 2 years, while panel manufacturers typically warranty material finish and colour fade for 10 to 15 years.

  • Workmanship warranty covers fixing failures and water ingress.
  • Manufacturer warranty covers panel delamination and coating degradation.
  • Always request warranty terms in writing before signing a cladding contract.
WhatsApp us on +971505705176