What is the difference between cost management and quantity surveying?

Cost management is the ongoing discipline of planning and controlling project costs, while quantity surveying is a specific set of measurement and cost-estimation techniques used within it.

  • Quantity surveying focuses on measurement, bills of quantities, and valuations.
  • Cost management covers the wider budget strategy, value engineering, and risk forecasting.
  • In UAE practice, many firms offer both services under one team.

What is value engineering and when should it happen?

Value engineering is a structured review of design choices to reduce cost or time without cutting function or quality.

  • It works best when applied early, during concept or schematic design.
  • Applying it after detailed design or tender limits the potential savings.
  • UAE cost management firms typically run value engineering workshops with the design team.

How much do cost management services cost in UAE?

Cost management fees in the UAE are usually quoted as a percentage of construction value or as a fixed lump sum for a defined scope.

  • Percentage-based fees typically scale with total project value.
  • Fixed fees are common for smaller or well-defined scopes.
  • Request a written fee proposal that specifies exactly what stages are covered.

What license does a cost management firm need in the UAE?

Cost management firms need a professional consultancy license from the Department of Economic Development (DED) or the relevant free zone authority.

  • Corporate structure and licensing fall under the UAE Commercial Companies Law (Federal Decree-Law No. 32 of 2021).
  • Free zone-based consultancies (e.g. JAFZA, DMCC) license through their free zone authority instead of DED.
  • Always verify the license is current before signing an engagement.

How does cost control work during a construction project?

Cost control tracks actual spend against the approved budget throughout construction and flags variances as they emerge.

  • Cost consultants typically issue monthly cost reports to the client.
  • Variations and change orders are priced and tracked against the original contract sum.
  • Early flagging of overruns allows corrective action before costs escalate further.

Who is liable for cost overruns caused by design defects in UAE projects?

Liability for structural design defects generally falls on the contractor and supervising consultant under Article 880 of the UAE Civil Code (Federal Law No. 5 of 1985).

  • This decennial liability provision covers major structural defects for a set period after handover.
  • Cost management firms document cost impact but are not typically the liable party for design defects.
  • Disputes over liability are often resolved through the Dubai International Arbitration Centre (DIAC).

What is life cycle costing and does it apply in the UAE?

Life cycle costing evaluates the total cost of a building or asset over its full operational life, not just the initial construction cost.

  • It factors in maintenance, energy use, and replacement costs over time.
  • UAE developers increasingly request it for sustainability-linked and green-building projects.
  • It is typically prepared alongside the initial cost plan by a cost management consultant.

What contract forms do UAE cost management firms typically use?

Most UAE cost management and consultancy contracts are administered under FIDIC standard forms.

  • FIDIC is the internationally recognized contract suite most widely used across GCC construction.
  • It defines procedures for variations, claims, and payment certification.
  • Cost managers typically administer these procedures on behalf of the client.

How do I compare cost management firms in the UAE?

Compare firms on relevant project experience, professional accreditation, and licensing status.

  • Ask for references from projects of similar scale and sector.
  • Check for RICS-accredited or chartered staff on the proposed team.
  • Confirm the DED or free zone consultancy license is active.
  • Review verified contact details on directories such as DCCIInfo before shortlisting.

When should a developer bring in a cost management consultant?

A cost management consultant should be engaged as early as feasibility or concept design, not after tender.

  • Early engagement allows the biggest potential cost savings through value engineering.
  • Late engagement limits the consultant to reporting on costs already committed.
  • Most UAE cost overruns trace back to decisions locked in during early design stages.