SEARCH CATEGORY/COMPANY
The UAE construction market was valued at more than USD 45 billion in 2025 and is forecast to keep growing through 2026 and beyond, driven by government infrastructure spending, mega-projects tied to the Dubai 2040 Urban Master Plan, and continued private-sector investment. Dubai alone accounts for over 40% of national construction activity, and residential building remains the single largest segment of spend. Against this backdrop, structural quantity surveying has become one of the most in-demand technical disciplines in the region, with clients depending on accurate bills of quantities, cost plans, and interim valuations to keep projects on budget from design stage through final account.
Structural quantity surveying is the discipline of measuring, costing, and managing the financial aspects of construction projects, with particular focus on structural elements such as foundations, concrete frames, steelwork, and reinforcement. Quantity surveyors (QS) prepare bills of quantities (BOQ), estimate material and labour costs, administer contracts, value interim payments, and manage variations and final accounts. In the UAE, most established QS practices follow RICS (Royal Institution of Chartered Surveyors) methodology, including the New Rules of Measurement (NRM), to ensure cost plans are consistent, auditable, and internationally benchmarked.
Early-stage cost estimation, feasibility studies, and elemental cost plans that help developers and consultants set realistic budgets before tendering begins.
Detailed measurement and description of all structural, architectural, and MEP works, used by contractors to prepare competitive and comparable tender bids.
Interim valuations, variation assessment, and final account negotiation carried out throughout the construction phase to protect both client and contractor interests.
Specialist quantity surveying focused on structural steel tonnage, reinforcement schedules, and concrete volumes for high-rise and infrastructure projects.
DCCIInfo currently lists 16 verified structural quantity surveying companies operating in the UAE, including established international names such as Aecom, Arcadis, Rider Levett Bucknall, and Gardiner & Theobald, alongside specialist local practices such as Blair-Anderson Chartered Surveyors and Kulkarni Quantity Surveyors. Each listing includes verified phone numbers, addresses, and category classifications to help developers and contractors shortlist a QS partner quickly.
As the UAE's construction pipeline continues to expand under the Dubai 2040 Urban Master Plan and Abu Dhabi's infrastructure programme, accurate structural quantity surveying will remain central to keeping projects on budget and on schedule. Whether you need a pre-contract cost plan, a full bill of quantities, or post-contract final account support, the verified companies listed on DCCIInfo give you a direct, trustworthy starting point for sourcing RICS-aligned quantity surveying expertise across Dubai, Abu Dhabi, and the wider UAE.
A structural quantity surveyor measures, costs, and manages the financial side of construction projects, focusing on structural elements like concrete, steel, and foundations. Core tasks include:
Quantity surveying fees in Dubai typically range from 0.5% to 2% of total construction value, depending on project size, complexity, and scope of service. Key cost factors include:
RICS certification is not a legal requirement to practise in the UAE, but it is the industry-recognised benchmark most developers, banks, and international contractors expect. RICS-qualified surveyors bring:
A bill of quantities is a detailed, itemised document listing all materials, labour, and work sections required to complete a project, used to obtain comparable tender prices. A typical BOQ includes:
Dubai Municipality is the primary authority that reviews and approves structural drawings, building permits, and as-built documentation on mainland Dubai projects. Depending on location, other bodies may also be involved:
Pre-contract quantity surveying happens before construction starts and focuses on budgeting and tendering, while post-contract quantity surveying manages costs during and after construction. The main differences are:
A full bill of quantities typically takes between 2 to 6 weeks to prepare, depending on project size, drawing completeness, and structural complexity. Timeline factors include:
Yes, quantity surveyors regularly support payment dispute resolution by providing independent valuations and expert reports. Their role typically includes:
Before hiring a quantity surveying firm in Dubai, verify their professional accreditation, project track record, and licensing status. Key checks include:
Yes, structural quantity surveying services are available across Dubai, Abu Dhabi, Sharjah, and the other UAE emirates, though most established consultancies are headquartered in Dubai. Coverage typically includes: