Top Quantity Surveyors in UAE - RICS-Affiliated Cost Consultancy & Bill of Quantities Experts

Home > UAE > Surveyors Quantity in UAE - 22 Listings
  • P.O. Box:
    118587
  • Address :
    Al Nahda, Saheel 1, 309
  • Area :
    Al Nahda
  • City :
    Dubai

Al Rayyan Consultancy (ARC), is a young Chartered Quantity Surveying and Cost Consulting firm, established in 2015, with the objective to bring value for clients money and bring the construction dream into reality.ARC provides comprehensive professio...
  • P.O. Box:
    9315
  • Address :
    Karama, Pyramid Bldg
  • Area :
    Karama
  • City :
    Dubai

  • P.O. Box:
    7856
  • Address :
    Dubai Healthcare City, Bldg C/P54
  • Area :
    Dubai Healthcare City
  • City :
    Dubai

  • Address :
    Block-B, 2nd Floor, Office No. 211, Al Hudaiba Awards Building - Jumeira St - Dubai
  • Area :
    Jumeirah
  • City :
    Dubai
Categories: Surveyors Quantity

  • P.O. Box:
    1801
  • Address :
    Bur Dubai, Al Musalla Rd, Al Mussalla Tower
  • Area :
    Bur Dubai
  • City :
    Dubai

  • P.O. Box:
    41124
  • Address :
    Khalifa St, Wazeem S/Mkt Bldg, Bhnd NBAD
  • City :
    Abu Dhabi
Categories: Surveyors Quantity

  • P.O. Box:
    10216
  • Address :
    Office 102, 1st Floor, Al Asmawi Bldg, Jebel Ali
  • City :
    Dubai

  • Address :
    Sheikh Zayed Rd, Business Bay, Bayswater Office Tower
  • Area :
    Sh Zayed Road
  • City :
    Dubai

  • P.O. Box:
    79689
  • Address :
    Office # 306, Belhoul Group Building Garhoud, Dubai, UAE
  • Area :
    Garhoud
  • City :
    Dubai

  • P.O. Box:
    211928
  • Address :
    Bur Dubai, Umm Hurair St
  • Area :
    Bur Dubai
  • City :
    Dubai
Categories: Surveyors Quantity

  • P.O. Box:
    26288
  • Address :
    Nr Wafi
  • Area :
    Dubai
  • City :
    Dubai
Categories: Surveyors Quantity

Results 1 - 20 out of 22

PROFILE OF Surveyors Quantity

FAQS

What does a quantity surveyor do on a UAE construction project?

A quantity surveyor manages and controls construction costs from initial design through to final account.

  • Prepares cost estimates and bills of quantities.
  • Reviews and certifies interim payment valuations.
  • Assesses variations and change-order pricing.
  • Prepares final account settlement at project close.

Do UAE quantity surveyors need to be RICS qualified?

RICS membership is not a legal requirement in the UAE, but it is the recognized professional benchmark for the industry.

  • The Royal Institution of Chartered Surveyors (RICS) sets international standards for cost consultancy.
  • Most major UAE developers and consultancies prefer or require RICS-accredited staff on senior roles.
  • The firm itself must still hold a valid DED or free zone consultancy license.

How much do quantity surveying services cost in Dubai?

Quantity surveying fees in Dubai are typically charged as a percentage of construction value or as a fixed lump sum, depending on project scope.

  • Percentage-based fees scale with the total construction contract value.
  • Smaller projects may be quoted a fixed fee instead.
  • Always request an itemized fee proposal before appointment.

What is a bill of quantities and why is it needed?

A bill of quantities is a detailed, measured list of all materials, labor, and work items priced by contractors during tendering.

  • It allows multiple contractors to be compared on a like-for-like basis.
  • It reduces disputes by clearly defining scope and quantities.
  • It is prepared from architectural and engineering drawings by the quantity surveyor.

What license does a quantity surveying firm need in the UAE?

Quantity surveying firms need a professional or engineering consultancy license issued by the Department of Economic Development (DED) in their operating emirate.

  • Licensing and corporate structure fall under the UAE Commercial Companies Law (Federal Decree-Law No. 32 of 2021).
  • Free zone-based consultancies license through the relevant free zone authority instead of DED.
  • Always verify the license is current before signing an appointment letter.

Who is legally responsible for construction defects in the UAE?

Contractors and supervising consultants share decennial liability for structural defects under Article 880 of the UAE Civil Code (Federal Law No. 5 of 1985).

  • This liability generally covers major structural defects for a period after handover.
  • Quantity surveyors are typically not the liable party but document defects during final account processes.
  • Disputes are often resolved through the Dubai International Arbitration Centre (DIAC).

What is the difference between a quantity surveyor and a cost consultant?

In UAE practice, the terms quantity surveyor and cost consultant are used interchangeably.

  • Both roles cover cost estimation, cost control, and contract administration.
  • Larger international firms often use the title "cost consultant" or "cost manager."
  • Smaller and traditional practices tend to use "quantity surveyor."

How do quantity surveyors handle variations and claims in UAE contracts?

Quantity surveyors assess and price variations against the original contract sum, then negotiate agreement with the client or contractor.

  • Most UAE contracts reference FIDIC standard forms for variation procedures.
  • Extension-of-time and loss-and-expense claims are prepared with supporting cost evidence.
  • Unresolved disputes may proceed to DIAC arbitration.

How do I choose a quantity surveying firm in the UAE?

Choose a firm based on relevant project experience, professional accreditation, and a valid consultancy license.

  • Check for RICS-accredited staff or chartered surveyors on the team.
  • Ask for references from projects of similar scale and building type.
  • Confirm the DED or free zone consultancy license is active.
  • Review verified contact details on directories such as DCCIInfo before reaching out.

What construction cost benchmarks apply in the UAE right now?

UAE residential construction costs ranged from roughly AED 4,200 to AED 11,000 per square meter in Q2 2025, depending on finish level.

  • Standard villas averaged around AED 4,200 per square meter.
  • High-end villas reached approximately AED 11,000 per square meter.
  • Commercial building costs ranged between AED 5,500 and AED 7,300 per square meter in H1 2025.
  • A quantity surveyor benchmarks project-specific costs against these market rates.
WhatsApp us on +971505705176